Important Design and Configuration changes in Controlling with SAP S/4HANA

Important Design and Configuration changes in Controlling with SAP S/4HANA

  • By
  • Ashish Sampat

Subscription

$159

  • Single License
  • $13.25 per month
  • Renews automatically

Share this Product

  • Cost Elements part of G/L account
  • Account-based profitability analysis
  • Material Ledger mandatory
  • Production variances